The Meerut Metro Project is one of the most ambitious public transport developments in Uttar Pradesh. As part of Phase 1, the metro line will include 13 stations, stretching from Meerut South Metro Station to Modipuram Depot Metro Station. Among these, Partapur Metro Station plays a key role as the second stop on the route, serving as a modern hub for daily commuters. With operations expected to begin in September 2025, this station will transform travel for residents of western Meerut and nearby areas.
Partapur Meerut Metro Station Details
Here’s a quick look at the station’s technical and structural specifications:
| Particulars | Details |
| Station Name | Partapur Meerut Metro Station |
| Station Code | A11 |
| Expected Opening Date | August 2025 |
| Next Station (towards Modipuram) | Rithani Metro Station |
| Next Station (towards Meerut South) | Meerut South Metro Station |
| Length | ~75 meters |
| Width | ~36 meters |
| Height | ~22 meters |
| Entry/Exit Gates | Yes |
| Lifts and Escalators | Available |
| Parking | Available |
| Platforms | 2 |
| Railway Tracks | 4 |
| RRTS Connectivity | No |
also read : – Meerut South Metro Station: Complete Guide with Facilities, Ticket Prices & Timings
About Partapur Metro Station
The Partapur Metro Station is being developed with a design that makes it unique compared to many other stations in the corridor. It will feature 2 platforms and 4 tracks, supporting both metro services and the smooth passage of Namo Bharat trains.
The station is spread across an area of approximately 75 meters in length, 36 meters in breadth, and 22 meters in height. To make commuting smooth and accessible, the station includes two entry-exit gates, lifts, and escalators.
Construction has reached advanced stages, with flooring nearly complete and technical rooms already in place. Work on installing modern facilities and the prefabricated roof structure is ongoing. Once operational, the station will significantly reduce travel time for residents while easing traffic congestion on nearby roads.
Structure and Facilities
The Partapur Metro Station is designed across three levels:
- Ground level – Designed for easy entry and exit, including parking facilities and access lanes for smooth traffic.
- Concourse level – Equipped with ticket counters, digital information displays, and passenger waiting areas.
- Platform level – Two side platforms with modern safety measures, supported by 4 railway tracks.
The availability of service lanes, lifts, escalators, and parking space will make this station user-friendly for all age groups, including senior citizens and differently-abled passengers.
Partapur Metro Station Route Map
The Meerut Metro route will connect commuters across 13 stations from Meerut South to Modipuram Depot. Partapur, being the second station, is strategically placed to cater to daily travelers.
- Next station towards Modipuram: Rithani Metro Station
- Next station towards Meerut South: Meerut South Metro Station
This positioning will improve overall connectivity for local neighborhoods and nearby business zones.
Impact on Connectivity
Once operational, the Partapur Metro Station will:
- Improve urban mobility by reducing dependence on road transport.
- Ease congestion on NH-34 and nearby areas.
- Enhance accessibility for students, professionals, and business owners in Meerut.
- Provide a faster and safer alternative to traditional modes of transport.
By integrating with other stations on the corridor, Partapur will serve as an important transit point for thousands of passengers daily.
FAQs about Partapur Metro Station
Q1: When will Partapur Metro Station open for the public?
The station is expected to open in September 2025 after the completion of trial runs and safety checks.
Q2: How many tracks and platforms does the station have?
Partapur Metro Station will feature 2 platforms and 4 tracks.
Q3: Does Partapur Metro Station have parking facilities?
Yes, dedicated parking space will be available near the entry and exit gates.
Q4: Is there RRTS (Namo Bharat) connectivity at this station?
No, Partapur Metro Station will serve only the metro line and not have RRTS connectivity.
Q5: Which stations are next to Partapur on the route?
Towards Modipuram Depot: Rithani Metro Station
Towards Meerut South: Meerut South Metro Station
Final Thoughts
The Partapur Metro Station is not just another stop on the route—it is a well-planned infrastructure project that will enhance connectivity and ease the daily commute for thousands of people in Meerut. With its modern facilities, elevated structure, and focus on passenger comfort, the station is set to become a key hub once operations begin in September 2025.
The combination of accessibility, convenience, and smart design makes Partapur Metro Station a vital part of the Meerut Metro Phase 1 project, ensuring better travel options for the city’s growing population.