Sarai Kale Khan is set to become one of four RRTS stations in Delhi, alongside New Ashok Nagar and Anand Vihar (already operational) and Jangpura (under construction). It will be the 3rd operational Rapid Metro station in Delhi. Located in Southeast Delhi, this elevated hub is designed as a major interchange point and is expected to open by Aug 2025.
Station Overview
| Particulars | Details |
| Station Name | Sarai Kale Khan RRTS Station |
| Address | Sarai Kale Khan, South East Delhi |
| Station Code | Z00 |
| Owned By | NCRTC |
| Opening Date | Expected June 2025 |
| Structure | Elevated |
| Length × Width × Height | 215 m × 50 m × 15 m |
| Platforms | 6 Platforms |
| Tracks | 4 Tracks |
| Gates | 5 Entry/Exit Gates |
| Lifts | 14 Lifts |
| Escalators | 18 Escalators |
| Metro Connectivity | Yes – Pink Line |
| Parking Facilities | Yes, Available |
| Next Station Towards Delhi | Jangpura (Under Construction) |
| Next Station Towards Meerut | New Ashok Nagar |
Nearby Landmarks & Connectivity
- Hazrat Nizamuddin Railway Station – directly linked via skywalk.
- Delhi Metro Pink Line – interchange connectivity.
- Sarai Kale Khan ISBT – integrated with bus services.
- Ring Road – close highway access, ensuring smooth road connectivity.
This makes Sarai Kale Khan one of the most important multimodal hubs in Delhi.
Ticket Prices
Fare details are not yet announced. Passengers will have the option of standard and premium class tickets once operations begin.
also read : – Modipuram RRTS Station
Parking & Facilities
Facilities at Station
| Facility | Location |
| First Aid | Station Control Room |
| Drinking Water | Inside paid concourse |
| Washroom | Inside paid concourse |
Parking Charges
| Time | Bicycle | Two-Wheeler | Four-Wheeler |
| Up to 10 min (pick/drop) | Free | Free | Free |
| 10 min – 6 hrs | Free | ₹20 | ₹50 |
| 6 – 12 hrs | ₹5 | ₹30 | ₹80 |
| 12 – 16 hrs | ₹10 | ₹40 | ₹90 |
| 16 hrs – till close | ₹20 | ₹50 | ₹100 |
| Night Parking (12 AM – 5 AM) | ₹20 | ₹60 | ₹200 |
| Monthly (5 AM – 11 PM) | – | ₹600 | ₹2000 |
| Monthly (24/7) | – | ₹1000 | ₹3000 |
Gates at Sarai Kale Khan
| Gate No. | Status | Towards |
| 1 | Planned | ISBT |
| 2 | Planned | Ring Road |
| 3 | Planned | Hazrat Nizamuddin Station |
| 4 | Planned | Pink Line Metro |
| 5 | Planned | Bus Terminal |
Platforms
| Platform No. | Status | Towards | Facilities |
| 1 | Planned | Meerut Side | Waiting Areas |
| 2 | Planned | Meerut Side | Waiting Areas |
| 3 | Planned | Delhi Side | Premium Lounge |
| 4 | Planned | Delhi Side | Premium Lounge |
| 5 | Planned | Interchange | Passenger Lounge |
| 6 | Planned | Interchange | Passenger Lounge |
Lifts
| Lift No. | Status | Way/Location |
| 1–14 | Planned | Connecting concourse, platforms, and gates |
Escalators
| Escalator No. | Status | Way/Location |
| 1–18 | Planned | Between concourse, gates, and platforms |
Train Timings (Expected)
The exact timings will be announced closer to opening. Based on other RRTS stations:
- First Train: Around 6:00 AM (Monday–Saturday) and 8:00 AM (Sunday)
- Last Train: Around 10:00 PM daily
FAQs about Sarai Kale Khan RRTS Station
Q1. When will Sarai Kale Khan RRTS Station open?
By June 2025.
Q2. How many gates will the station have?
It will have 5 entry/exit gates.
Q3. How many platforms are planned?
6 elevated platforms with 4 tracks.
Q4. Will it connect to the Delhi Metro?
Yes, direct interchange with the Pink Line.
Q5. What nearby transport hubs are accessible?
Hazrat Nizamuddin Railway Station, ISBT, and Ring Road.
Q6. What facilities will be available inside the station?
First aid, drinking water, washrooms, lifts, escalators, and parking.
Q7. What is the station code of Sarai Kale Khan RRTS?
Z00.