The Meerut Metro Phase 1 project is a landmark urban transport development that aims to make travel across Meerut faster and smoother. With 13 stations in total, the line will feature a mix of elevated, underground, and at-grade structures, offering modern facilities for commuters.
Among these stations, Shatabdi Nagar Metro Station stands out because it will serve as an interchange point between the Meerut Metro and the Delhi–Meerut RRTS (Namo Bharat Train). This makes it one of the most important stops on the corridor, as passengers will be able to switch easily between the high-speed RRTS service and the local metro line.
Shatabdi Nagar Metro Station Details
| Particulars | Details |
| Station Name | Shatabdi Nagar Meerut Metro Station |
| Address | Shatabdi Nagar, Sector 5, MDA, Meerut |
| Nearby Landmark | Shopprix Mall / Dainik Jagran Office |
| Station Code | A13 |
| Owned By | NCRTC |
| Opening Date (Expected) | September 2025 |
| Next Station Towards Meerut South | Rithani Metro Station |
| Next Station Towards Modipuram | Brahmapuri Metro Station |
| Structure | Elevated Station |
| Status | Under Construction |
| RRTS Connectivity | Yes |
| No. of Entry-Exit Gates | 2 |
| No. of Platforms | 4 |
| Parking Facility | Yes, Available |
| Height of Station | 15 meters |
| Length of Station | 215 meters |
| Width of Station | 30 meters |
| Station Contact Number | To be updated |
also read : – Delhi to Meerut Metro Map
About Shatabdi Nagar Metro Station
The Shatabdi Nagar Metro Station is officially coded as A13 and is the 4th station on the Meerut Metro route. Located at Sector 5, MDA, Meerut, near the well-known Shopprix Mall, this station is being constructed as an elevated facility with all modern commuter amenities.
The station is expected to be open for passengers by September 2025. It will feature 2 entry-exit gates, 4 platforms, and a dedicated parking facility. Its large dimensions — 215 meters in length, 30 meters in width, and 15 meters in height — ensure smooth passenger movement even during peak hours.
Unique Feature: Metro + RRTS on Same Track
One of the most unique aspects of Shatabdi Nagar Metro Station is that it will serve both the Meerut Metro and the Namo Bharat Train (Delhi–Meerut RRTS). This is the first time in India that semi-high-speed trains and metro services will run on the same infrastructure.
This dual usage will help commuters save time and enjoy seamless travel within Meerut city and beyond to Delhi, Ghaziabad, and Modipuram. It also highlights Meerut’s role as a pioneer in India’s evolving urban mobility sector.
Progress and Current Status
- Construction Work: Entry-exit gates are near completion.
- Parking Area: Work is in progress for parking facilities to handle two-wheelers and four-wheelers.
- Trial Runs: NCRTC has already started trial runs on sections that include Shatabdi Nagar.
- Integration: Technical work to integrate RRTS and metro operations at the same station is in its final stages.
Once completed, this station will transform connectivity for thousands of daily commuters.
Connectivity and Route
- Towards Meerut South: The next metro stop is Rithani Metro Station.
- Towards Modipuram: The next station is Brahmapuri Metro Station.
- RRTS Connectivity: Passengers will be able to directly interchange between Namo Bharat RRTS trains and the Meerut Metro, ensuring smooth travel across different networks.
FAQs on Shatabdi Nagar Metro Station
Q1. When will Shatabdi Nagar Metro Station open?
The station is expected to open for passengers by September 2025.
Q2. Does the Namo Bharat Train stop at Shatabdi Nagar?
Yes, both the Meerut Metro and the Namo Bharat RRTS trains will stop at this station.
Q3. How many platforms will Shatabdi Nagar Metro Station have?
The station will feature 4 platforms, designed to handle both metro and RRTS trains.
Q4. Will parking facilities be available?
Yes, parking facilities for passengers are planned near the station premises.
Q5. What makes this station special compared to others?
This is the first station in India where semi-high-speed trains (RRTS) and metro services will share the same tracks and infrastructure, offering a unique travel experience.
Final Thoughts
The Shatabdi Nagar Metro Station is more than just a stop on the Meerut Metro line. With its dual connectivity to both the Meerut Metro and the Delhi–Meerut RRTS, it will become one of the most crucial junctions for commuters in the region. By offering smooth interchange facilities, modern infrastructure, and a strategic location near key city landmarks, the station is expected to play a pivotal role in shaping Meerut’s transport future.
By September 2025, when it becomes operational, Shatabdi Nagar will stand as a symbol of innovation, integration, and passenger convenience in India’s growing metro and rapid rail ecosystem.